Example work product · Tactical sourcing

RFQ sourcing package
Commercial HVAC assessment, repair & maintenance

A fitness studio's rooftop HVAC unit was underperforming — and in a business where client comfort is the product, that's urgent. This is the complete, ready-to-issue procurement package we delivered: classification, specifications, supplier shortlist, evaluation model, and negotiation playbook.

ClientFitness studio, Metro Vancouver BC
CategoryHVAC repair, assessment & maintenance
ClassificationCost (commodity-based service)
MethodRFQ — expedited, price-focused
BudgetUnder $5,000 CAD
Cycle timeRFQ issue → PO in ~2.5 weeks

1 · Classify first, then choose the process

Not every purchase deserves an RFP. The framework matched the process to the spend — an expedited RFQ, not a six-week formal tender.

FactorAssessmentImplication
Service valueUnder $5,000 CADBelow competitive-bid threshold; RFQ appropriate
Scope complexityWell-defined, standardizedPrice-focused evaluation is viable
Market conditions6+ qualified suppliers in the regionCompetitive sourcing will yield fair pricing
Risk levelLow–medium (comfort, not safety-critical)Simplified evaluation acceptable
Urgency1–4 weeksExpedited RFQ timeline; no time for full RFP

2 · Specifications with teeth: three phases, each with SLAs

Suppliers quoted all three phases as a bundle with line-item transparency — no verbal-only diagnoses, no open-ended repair bills.

Phase 1Assessment & diagnosis

  • Full RTU inspection within 1 business day of site visit
  • Written root-cause findings — not verbal-only
  • Diagnostic report with photos in 2 business days
  • Repair-vs-replace analysis with 5-year TCO comparison

Phase 2Repair

  • Approved scope only; complete within 5 business days
  • 1-year parts / 90-day labour warranty in writing
  • Full heat + cool test cycle with before/after results
  • Signed commissioning checklist on completion day

Phase 3Preventive maintenance

  • Quarterly/semi-annual plan sized to the unit and studio hours
  • No visits during peak class hours (6–9 AM, 4–7 PM)
  • 4-hour emergency response during business hours
  • Fixed annual fee preferred; not-to-exceed quote
Seniority right-sizing: the statement of work assigns a senior/journeyman technician to diagnosis and emergency calls — where judgment matters — and allows supervised technician/apprentice rates for routine checklist maintenance. Clients shouldn't pay senior rates for filter changes.

3 · Weighted evaluation model

Published to suppliers up front. Scoring on a 1–5 scale; final score = weight × rating.

CriterionWeightWhat we evaluate
Cost competitiveness
30%
Total price, PM annual cost, emergency rates, line-item transparency
Technical capability
20%
RTU experience, certifications, commercial-system familiarity
Responsiveness & reliability
15%
Response time, availability, scheduling around studio hours
Professionalism & reputation
15%
Reviews, references, no-upsell attitude
Maintenance program quality
10%
PM comprehensiveness, fixed-fee willingness, emergency terms
Warranty & risk
10%
Warranty duration, insurance, WorkSafeBC compliance, cost caps

4 · Supplier shortlist from live market research

Six qualified commercial HVAC firms identified and ranked by proximity and fit; RFQ issued to the top four. (Names withheld here.)

SupplierLocationFitRationale
Supplier ASame municipality (local)HighClosest to site; commercial RTU experience
Supplier BNorth ShoreHighStrong commercial reviews; PM programs offered
Supplier CGreater VancouverMed-highLarger commercial capacity; slightly farther
Supplier DNorth VancouverMed-highEstablished local firm; gas + HVAC certified
Suppliers E–FVancouverMedHeld in reserve if initial quotes aren't competitive

5 · Negotiation playbook, written before quotes arrive

Every key term has a target and a fallback — so the negotiation is a checklist, not an improvisation.

TermTarget positionFallback position
Assessment feeFixed lump-sum; no hourly billingHourly with not-to-exceed cap
Repair cost capWritten estimate first; 10% variance limit15% variance with written approval
PM pricing modelFixed annual fee (quarterly visits)Per-visit pricing with annual cap
Warranty — parts / labour1 year / 90 days6 months / 60 days minimum
Emergency response SLA4-hour response, business hoursSame-day response
Payment termsNet-30Net-15 if supplier requires
Insurance$2M commercial general liability$1M with proof of WorkSafeBC

6 · Contract governance after award

The package ships with the KPIs that will manage the supplier — defined before the contract is signed.

KPITargetFrequency
Assessment report deliveryWithin 2 business days of site visitPer occurrence
Repair completionWithin 5 business days of approvalPer occurrence
PM visit adherence100% of scheduled visits on timeQuarterly
Emergency responseWithin 4 hours, business hoursPer occurrence
Invoice accuracy100% match to approved amountsPer invoice
Client satisfactionStudio manager rating ≥ 4/5After each visit

Drawn from a real ProcureVenn client engagement. Client identity, stakeholder names, and supplier names have been anonymized for confidentiality; the package structure, specifications, evaluation model, and negotiation framework are as delivered.